Institutional Grade
Hardware & Software Architecture
Every device and software license is standardised, costed to the shilling, and deployed under a turnkey 3-year support SLA. KICD- approved digital textbooks, zero-downtime infrastructure, and institutional-grade endpoint management — from day one.
Standardised Hardware Portfolio
Every component costed, specified, and warrantied
No procurement ambiguity. Every deployment uses these exact models at these exact contract prices — published transparently so that every shilling is accountable.
Teacher Command Node
Acer TravelMate P4 Spin 14 (NPU)
- Intel Core Ultra 5 125U with AI Boost NPU
- 16GB DDR5 RAM, 512GB NVMe SSD
- 14" WUXGA IPS touchscreen with active stylus
- Wi-Fi 6E, Bluetooth 5.1, Gigabit Ethernet
- Windows 11 Pro for Education
Student Windows Laptop
Acer TravelMate B3 Spin 11 Touch
- Intel N200, 8GB LPDDR5 RAM, 128GB eMMC
- 11.6" HD 10-point multi-touch IPS, active stylus
- Wi-Fi 6E, Bluetooth 5.2, world-facing camera
- MIL-STD 810H drop-resistant chassis
- Windows 11 Pro for Education
Student Chromebook
Acer Chromebook C736
- Intel N100, 8GB LPDDR5 RAM, 32GB eMMC
- 11.6" HD Multi-Touch IPS, Wi-Fi 6E
- Chrome Education Upgrade enrolled
- Google Workspace for Education
- Fanless, tamper-resistant design
VDI Smart Lab Architecture
vCloudPoint V1 + Dual Xeon RDS Server
- vCloudPoint V1 Zero Client — 5 Watts, fanless
- Dual Xeon 64GB VDI RDS Server
- Up to 30 concurrent workstations
- Acer V206Q 19.5" LED per station
- Gigabit 48-Port Switch + 6U Cabinet + CAT6 Cabling
Solar & Power Infrastructure
3kVA Hybrid Inverter + 5.12kWh LiFePO4
- 3kW Hybrid Inverter with 80A MPPT
- 5.12kWh LiFePO4 battery — 6,000+ cycles
- 4× 550W monocrystalline panels
- Powers entire lab for full school day
- Professional installation included
Classroom Peripherals & Network
Standardised across every deployment
- AOC MK160 Keyboard & Mouse Set — KES 1,800 per seat
- Gigabit 48-Port Switch + 6U Cabinet + CAT6 Cabling — KES 45,000
- Acer ACC320 Smart Charging Cart (32-Slot) — Ksh 120,000
- vMatrix Classroom Control (Bundled) — KES 0
- All components vendor-warrantied for 3 years
Initiative 1
1 School 1 Lab — VDI Smart Classroom
Enterprise-grade on-premise compute infrastructure for high-density student learning. Centralised Shared Computing (RDS) eliminates the desktop maintenance graveyard — zero IT burden, full co-management.
| Component | Qty | Unit (KES) | Total (KES) |
|---|---|---|---|
| VDI Central Host — Dual Xeon 64GB VDI RDS Server | 1 | Ksh 225,000.00 | Ksh 225,000.00 |
| VDI Endpoints — vCloudPoint V1 Zero Client × 30 | 30 | Ksh 28,350.00 | Ksh 850,500.00 |
| Visual Interfaces — Acer V206Q 19.5" LED × 30 | 30 | Ksh 14,623.50 | Ksh 438,705.00 |
| Teacher Command — Mini PC (Intel i3, 8GB RAM, 240GB SSD) | 1 | Ksh 52,000.00 | Ksh 52,000.00 |
| Network Infrastructure — Gigabit 48-Port Switch + 6U Cabinet + CAT6 Cabling | 1 | Ksh 45,000.00 | Ksh 45,000.00 |
| Input Peripherals — AOC MK160 Keyboard & Mouse Set × 30 | 30 | Ksh 1,800.00 | Ksh 54,000.00 |
| Classroom Software — vMatrix Classroom Control (Bundled) (Bundled) | 1 | Ksh 0.00 | Ksh 0.00 |
| Power Infrastructure — 3kVA Hybrid Inverter + 5.12kWh LiFePO4 | 1 | Ksh 300,000.00 | Ksh 300,000.00 |
| Consolidated Wholesale Discount | 1 | -Ksh 365,205.00 | -Ksh 365,205.00 |
| School Registration Fee (flat KES Ksh 25,000.00) | 1 | -Ksh 25,000.00 | -Ksh 25,000.00 |
| Itemised Turnkey Cost | Ksh 1,965,205.00 | ||
| Consolidated Wholesale Turnkey Contract | Ksh 1,575,000 | ||
The VDI Advantage
Traditional desktops consume up to 250W each. The vCloudPoint V1 endpoints draw 5W per seat — the entire lab runs on solar. Under our Green Pledge, each deployment includes 30 legacy trees planted.
Initiative 2
1 Student 1 Laptop — 50-Student Mobile Cohort
Cloud-first, flexible mobile computing with rugged touchscreen convertibles. Minimum 50 devices per deployment for local cluster viability. PreyProject geofencing + Workspace ONE UEM secure every device.
| Component | Qty | Unit (KES) | Total (KES) |
|---|---|---|---|
| Student Hardware — Acer TravelMate B3 Spin 11 Touch × 50 | 50 | Ksh 70,498.50 | Ksh 3,524,925.00 |
| Teacher Hardware — Acer TravelMate P4 Spin 14 (NPU) | 1 | Ksh 175,498.50 | Ksh 175,498.50 |
| Surge Storage — Acer ACC320 Smart Charging Cart (32-Slot) × 2 | 2 | Ksh 120,000.00 | Ksh 240,000.00 |
| Power Solution — 3kVA Hybrid Inverter + 5.12kWh LiFePO4 | 1 | Ksh 300,000.00 | Ksh 300,000.00 |
| Asset Security — PreyProject Enterprise — 3 Year × 50 | 50 | Ksh 10,800.00 | Ksh 540,000.00 |
| Support SLA — KaribuKloud Comprehensive SLA — 3 Year × 50 | 50 | Ksh 27,000.00 | Ksh 1,350,000.00 |
| Digital Textbooks — KICD OPIQ Student Package — 3 Year × 50 | 50 | Ksh 10,476.00 | Ksh 523,800.00 |
| OPIQ Teacher Console (Cohort Bonus — KES 0) | 1 | Ksh 0.00 | Ksh 0.00 |
| School Registration Fee (flat KES Ksh 25,000.00 per application) | 1 | (Ksh 25,000.00) | -Ksh 25,000.00 |
| Grand Total (Hardware + Software + Infrastructure) | Ksh 6,654,223.50 | ||
| School Registration Fee (flat Ksh 25,000.00 per application) | (Ksh 25,000.00) | ||
| Net Crowdfunding Target | Ksh 6,629,224 | ||
Cohort Bonus
With 50+ seats, the OPIQ Educator Suite is completely free (KES 0) — all teacher licenses are unlocked by the cohort. PreyProject and KaribuKloud SLA run for the full 3-year lifecycle on every student device.
Initiative 3
1 Teacher 1 Laptop — Educator Command Center
AI-ready mobile workstation with subsidised ownership. Teachers apply with a KES 500 fee and pay KES 3,000 co-payment; the remaining lifecycle cost is crowdfunded by sponsors.
| Component | B2B Cost (KES) | Sponsor Target |
|---|---|---|
| Acer TravelMate P4 Spin 14 (NPU) | Ksh 175,498.50 | Ksh 175,498.50 |
| OPIQ Educator Suite — 3 Year | Ksh 30,000.00 | Ksh 30,000.00 |
| PreyProject Enterprise — 3 Year | Ksh 10,800.00 | Ksh 10,800.00 |
| KaribuKloud Comprehensive SLA — 3 Year | Ksh 27,000.00 | Ksh 27,000.00 |
| Educator Co-Payment (KES 500 App Fee + KES 3,000/mo × 36 months) | — | (Ksh 108,500.00) |
| True 3-Year Lifecycle Value | Ksh 243,298.50 | — |
| Sponsor Crowdfunding Goal (per teacher) | Ksh 134,799 |
Architecture Decisions
Cloud & Multi-Cloud Deployment Models
Technical analysis covering the three most common infrastructure configurations in our deployment portfolio — evaluated for the operational realities of Kenyan classrooms.
VDI on GCP — DDP Protocol over Cloud
Scenario
vCloudPoint V1 zero clients connect remotely to the vMatrix Server Manager running on a Windows VM hosted inside Google Cloud Platform (GCP) via the Dynamic Desktop Protocol (DDP).
Technical Analysis
Since 100% of screen rendering, audio, and keystrokes are transmitted over the network, hosting the server on GCP requires a high-speed, stable fibre connection. For schools with constrained internet, we strongly recommend our on-premises vCloudPoint Server connected to a local Gigabit Ethernet switch backplane — which is our standard deployment model.
Benefit
Centralised image management, zero local server maintenance. Best suited for urban schools with dedicated fibre and sub-20ms latency to the GCP region.
Google Workspace on Windows RDS Lab
Scenario
Google Workspace (Docs, Sheets, Classroom, Gemini) accessed entirely through Google Chrome on the Windows Server session — rendered on the dual Xeon and projected to zero-client endpoints via DDP.
Technical Analysis
Google Workspace is a cloud-based SaaS platform. In a vCloud VDI Smart Lab, students open Google Chrome on their virtual desktops and log directly into their Google Workspace accounts. Because browser processing is handled centrally by the server's Dual Xeon processors and 64GB RAM, Google Workspace runs fast and smoothly for all 30 students simultaneously.
Benefit
Lower endpoint cost (zero-client vs Chromebook), centralised browser management, works with existing Windows Server CALs. Full Google for Education suite without requiring Chromebook hardware.
Microsoft 365 Education on ChromeOS
Scenario
M365 A1 Education license (free cloud tier for qualifying schools) provisioned on Acer Chromebooks managed under the Google Admin Console. Students run full web-based Office apps natively in Chrome.
Technical Analysis
This is our recommended cloud-managed deployment path for schools that prefer Google's management simplicity but want students to build Microsoft Office fluency. Students open Google Chrome on their Chromebooks, log in to Microsoft Teams, and run web-based Word, Excel, PowerPoint, and OneNote — all at zero licensing cost (KES 0). Student identities are managed through Google Cloud Identity with SAML federation to Azure AD.
Benefit
Zero Windows licensing cost. Full Office suite via browser. Offline PWA support. Google Cloud Identity ↔ Azure AD federation for unified login. Best of both ecosystems at KES 0.
Microsoft vs. Google — How We Deploy Both
The Shule Project is ecosystem-agnostic. We deploy Microsoft 365 and Google Workspace side by side, choosing the right toolchain for each school's operational context.
Do all vCloud Devices run on Windows?
Can vCloud Devices run on Google Cloud?
Can we install Google Workspace on the Server?
How can we run a Microsoft Education License on Google Chrome?
What about the OPIQ Cohort Bonus for teacher licenses?
At a Glance
Quick Budget Reference
Select deployment sizes with computed net crowdfunding budgets. Every figure is auto-calculated from the published unit cost table.
| Deployment | Gross Cost | Offset / Contribution | Net Target (KES) |
|---|---|---|---|
| 1 Teacher (3-Year Lifecycle) | Ksh 243,299 | −Ksh 108,500 | Ksh 134,799 |
| 10 Teachers (3-Year Lifecycle) | Ksh 2,432,985 | −Ksh 1,085,000 | Ksh 1,347,985 |
| 50 Students — Mobile Cohort | Ksh 6,654,224 | −Ksh 25,000 | Ksh 6,629,224 |
| 30-Seat VDI Smart Lab | Ksh 1,965,205 | −Ksh 25,000 | Ksh 1,575,000 |
Ready to deploy institutional-grade infrastructure?
Every figure on this page is live — calculated from the same unit cost table that powers our crowdfunding engine. Start a deployment or fund an existing one.
Active Deployment Programmes
Active Programmes
Live, registered projects. Every contribution is tracked, every device managed under MDaaS, every tree logged under the Green Pledge. Budget targets are auto-calculated from published unit costs.